Construction / maintenance manager

Construction / maintenance manager

Werkervaring interimmanager

Work Experience
July2016 - ongoing
Marine Operations Manager / Offshore Construction Manager Viking bravo decommissioning project, Boskalis / Scaldis
Supervise installation of steel constructions, removal of risers and pump caissons prior to platform removal. Managing the operational side of the rope access subcontractor,
- Daily progress reports,
- Assure adherence to HSE and QA/QC standards
- Daily project meetings with platform OIM and subcontractors
- Supervising subcontractors.
- Check the proposed removal method for feasibility.
- Assess the proposals / quotations during office rotation.
- Manage the variation orders within the general contract
- Assure the planned delivery date of prefabricated materials is
- Monitor the delivery of the QA/QC documents by the subcontractor
- compiling a condition summary report of the executed works offshore.


May 2016- July 2016
Working as a Offshore Maintenance and modifications Superintendent at AJS on the Shell / NAM platforms
- Supervise installation of process equipment, Electrical and Instrumentation, Pump skids. Piping and Structural, Painting and Insulation
- Preparing Work permits and TRA’s
- Daily progress reports,
- Assure adherence to HSE and QA/QC standards

January 2016 - March 2016
Marine Operations Manager / offshore construction manager Thames JV a Boskalis and Scaldis joint venture for decommissioning offshore installations
Supervise installation of steel constructions / lift points prior to platform removal, pre lift preperations.
- Daily progress reports,
- Planning recourses and subcontractors
- Assure adherence to HSE and QA/QC standards
- Mobilization of the equipment for the project.
- Daily project meetings with platform OIM and subcontractors

July 2015 - January 2016
Offshore Construction Supervisor at ENGIE (GDF SUEZ)
Supervise installation of compressor skids. Piping and Structural, Painting and Insulation,
- Preparing Work permits and TRA’s
- Daily progress reports,
- Assure adherence to HSE and QA/QC standards
- Mobilization of the equipment for the project.
- Daily project meetings with platform OIM and client Project Managers

February 2014 - June 2015
Working as a Offshore Maintenance and modifications Superintendent at AJS on the Shell Onegas platforms
- Supervise installation of process equipment, Electrical and Instrumentation, Pump skids. Piping and Structural, Painting and Insulation
- Preparing Work permits and TRA’s
- Daily progress reports,
- Assure adherence to HSE and QA/QC standards
- Mobilization of the equipment for the project.
- Daily project meetings with platform OIM and client Project Managers
- Fabric Maintenance Barque platform, Supervising P&M, E&I, rope access team.
- Site supervisor, Den Helder Supervising P&M team, E&I, painting and insulation.
- K15A, replacement of Condensate vessel including piping and transferpumps. Supervising P&M team, E&I, painting and insulation.
- L13E installation of Corrosion inhibitor skid, including piping, supervising P&M team, E&I, painting and insulation.
- L9FF1, Offshore lifting and installation and commissioning of a eductor skid with a total weight of 80 ton.


March 2013 – November 2013
Working as a Offshore Construction Superintendent at Offshore windforce, a Boskalis and Volker Stevin joint venture
Dong / Scottish power, West Of Duddon Sands
- Supervise lifting and installation of the mono piles and transition pieces,
- Assure the installation is executed in a safe and timely manner,
- Supervise and control the lifting supervisors, riggers and subcontractors,
- Daily progress reports,
- Assure adherence to HSE and QA/QC standards
- Mobilization of the barge for the project.
- Daily project meetings with Barge management and client representative.

July 2011 – November 2012
Working as a Offshore Construction Superintendent at Van Oord Offshore Wind Projects. EDF, Teesside
- Supervise lifting and installation of the monopiles and transition pieces,
- Assure the installation is executed in a safe and timely manner,
- Supervise and control the lifting supervisors, riggers and subcontractors,
- Daily progress reports,
- Assure adherence to HSE and QA/QC standards
- Mobilization of the barge for the separate project stages.
- Daily project meetings with Barge management and client representative.

February 2010 – July 2011
Working as a Construction Supervisor on the DCV Balder deck and J-lay tower upgraded for the BP Block 31 project. Supervising the upgrades and lifetime extension works on the J-lay tower and pipe handling equipment. The installation of the CT barge mooring winches. And working as a Maintenance supervisor on the J-lay tower and pipe handling field during the BP block 31 project.
- Job preparations for the mechanics,
- writing / gathering job safety assessments,
- writing permits to work,
- assure the work is executed with a minimum downtime
- assure work is executed according HSE rules an regulations
- create work orders in INFOR (ships maintenance management system) and complete these work order with the relevant repair works history,
- liaise with the construction and pipe-lay crew for repairs and maintenance on the installation.
- Trouble shooting on the hydraulic systems.

2008 – January 2010
Rijksrederij
Area Maintenance Supervisor within the ‘Rijksrederij’ (government shipping company), crew (19 fte) a patrol vessel operated by the Customs, supervising technical inspectors (6 fte), monitoring maintenance contract at dedicated shipyards, account management of the bareboat chartered vessels. Monitoring maintenance budgets.





2001-2008
Baan Yachtbuilding & constructions v.o.f.,
Construction supervisor
General work planning. Managing 15 fte construction crew, procurement, progress and quality control. Organizing and supervising subcontractors and classification society.
Project supervisor aluminum hull construction 21 m sailing yacht (2008)
Project supervisor aluminum hull construction 20 m catamarans (2007)
Project supervisor, 28 m aluminum motor yacht refit. Supervising of structural changes, installing pipe systems, installation propulsion including engines, liaise with subcontractors interior, electrical and painting (2005-2006)
Work planning and supervising the fabrication and installation of aluminum constructions for luxury yachts.

1995-2000
Heerema Marine Contractors.
Deck engineer on the Balder and Thialf, preparing and operating installation equipment such as winches, piledriving equipment and lifting tools (1996-1998)
Member of the project team working on the conversion of the SSCV Balder into a Deepwater Construction Vessel. Gathering and comparing specs and details of the to be installed equipment and advise towards the project manager. Verifying construction drawings towards workability, accessibility and maintainability. Work preparations at the Leiden office for decommissioning and removal of the steam boilers with attached piping and decommissioning surplus anchor winches (1998), In order to create the necessary space for the new to be installed generators and auxiliary equipment .
Supervising the installation removal crew, in preparation of the conversion to Deepwater Construction Vessel (1999 - 2000)

Opleiding interimmanager

*MBO werktuigbouw / offshore onderhoudstechnologie
Bachelor
HBO afstudeerrichting onderhoudstechnologie

Talenkennis interimmanager

Nederlands
Engels

 beschikbaar?

Interim managers zoeken:

Opdrachtomschrijving :